Skip to content
Call Us: +27 66 215 4439

Risk Assessments and Safe Working Procedures Combo

5.0 (1 review)

R 900.00

Description

Risk Assessments and Safe Working Procedures Combo templates over 150 risk assessments and Safe Working Procedures. 

Risk assessment and safe working procedure for the following:

  • Risk Assessment Methodology and Method Statement Procedure
    • Method Statement Procedure
    • Risk Assessment Methodology and Procedure
  • Disc Cutters and Abrasive Wheels
    • Angle Grinders, Bench Grinders and Saws
    • Angle Grinders, Bench Grinders and Saws
  • Abseiling on Buildings
    • Abseiling on Buildings
  • Access & Egress
    • Access & Egress from site
    • Client, Visitor & Public
    • Public Accessibility to Site
    • Obstruction of Emergency Access
    • Working on Clients Premises
    • Protection of Passers-by
  • Animals
    • Animals
  • Asbestos Removal
    • Asbestos Removal
    • Asbestos Containing Material
  • Bitumen & Tarring
    • Boiler Use
    • Tarring & Bitumen Use
  • Brickwork and Blockwork
    • Brickwork, Blockwork & Stonework
    • Wall Tie Insulation
  • Burns
    • Electricity, Fire, Explosion, Chemicals
  • Carpentry and Joinery
    • Carpentry and Joinery
  • Cartridge Operated Tools
    • Use of Cartridge Operated Tools
  • Chainsaws
    • Chainsaw Use
  • Chasing Walls
    • Chasing Walls
  • Chemicals
    • Toxic Materials
    • General Chemicals
    • Diesel or Petrol
    • Flammable Materials
    • LPG
    • Lead or Lead Compounds
    • Material Storage
    • Insulating Materials (non-asbestos)
    • Biological Material
  • Cladding
    • Roof & Wall Cladding
    • Cutting in Roof & Wall Cladding
  • Abrasive Cleaning of Masonry Surfaces
    • Compressed air grit blasting or water jet cleaning
    • Builders Clean
    • Window Cleaning
    • High Pressure Water or Steam Cleaners
  • Coffer Dams and Caissons
    • Coffer Dams and Caissons
  • Compressed Air
    • Compressed Air
    • Compressors and pneumatic power tools
  • Concreting
    • Pouring Concrete
    • False work and Shuttering
    • Falsework – installation at high levels
    • Pouring slabs
    • Pre-cast
    • Forming External Openings
    • Forming holes in floor slabs, coring
    • Forming openings in internal walls
    • Cement
    • Wet Cement
    • Power Floating
    • Ready mix trucks and pumps
    • Steel fixing
  • Confined Spaces
    • Confined Spaces
  • Confined Spaces Toxic Atmosphere
  • Contaminated Land
    • Contaminated Land
  • Crushing and Screening Plant
    • Tipping into or crusher screen hopper
    • Clearing Blocked Screens or Crushers
  • Flying Particles
    • Hydraulic or Pneumatic Failure
  • Access or Egress
  • Demolition of Structures
    • Demolition of Structures
  • Diving
    • Diving
  • Dust and Fumes
    • Dust Generation
  • Electricity
    • Electrical Services
    • Overhead Cables
    • Temporary Electrical Supplies
    • Cable Pulling
    • Cable Trunking and Cable Tray
    • Access to Electrical Panels
    • Maintenance and Testing
    • Damaged Equipment
  • Excavation
    • Excavation
    • Excavation Buried Services
    • Excavation Excavators
    • Excavation Working In Excavations
  • Explosives
    • Explosives
  • Eye Injury
    • Eye Injury
  • Falling Objects
    • Falling Objects
  • Fire
    • Fire on Site
  • First Aid
    • First Aid
  • Flooding
    • Flooding
  • Glazing
    • Glazing
  • Laser Levelling Equipment
    • Laser Levelling Equipment Class 1 & 2
  • Lifting and Hoisting
    • Lifting Operations
    • Tower Cranes
    • Mobile Cranes
    • Self-Erecting Cranes
    • Goods Hoist
    • Excavators used for lifting
    • Slinging of Loads
    • Use of lifting equipment
    • Use of fork lift Trucks
    • Use of Loadalls Teleporters
  • Lone Working
    • Working Alone
  • Manholes
    • Breaking into an Existing Manhole
    • Work on live sewage connections
    • Manhole Construction – Brickwork
    • Manhole Construction P.C.C. Units
  • Manual Handling
    • Manual Handling of Blocks
  • Masonry
    • Stone Masonry
    • Stonework at High Level
  • Material Storage
    • Material Falling
    • MEWP’S Mobile Elevated working platforms
    • Scissor Lifts
    • Boom Lifts
    • Noise
    • Exposure to Noise
  • Office
    • Office Environment – Welfare & Storage
  • Painting
    • Painting
  • Piling
    • Piling Machinery
    • Underpinning
  • Pipelaying
    • Pipelaying
    • Laying of pipes & ducks
    • Portable Pipe Threading Machines
  • Plant & Equipment
    • Plant and Transport
    • Lift Trucks
    • Use of Site Dumpers
  • Plastering
    • Rendering Plastering
    • External Rendering
    • Dry Lining
  • Plumbing
    • Pipe Soldering
    • Plumping – Lead
    • First Fix Operations
    • Jointing Pipework – Spigot Socket
    • Second Fix Operations
  • Power Tools
    • Power Tools
    • Power Saws
  • Pressure Testing
    • Pressure Testing
  • Railways
    • Work on or near Railway Lines
  • Replacing Windows
    • Replacing Windows
  • Roadwork’s
    • Setting Out Traffic Management on Public Highway
    • Road Surfacing Plant
    • Road works
    • Laying of Flags and Kerbs
  • Roofing
    • Roof Work
    • Work on Fragile Roofs
    • Placing Roof Trusses
    • Roof Work on Flat Roofs
    • Sheeted Sloping Roofs
    • Leading
  • Scaffolding
    • Scaffolding
  • Site Set-Up
    • Before Demolition
    • Temporary Accommodation
  • Steelwork
    • Erection of Structural Steel
  • Tools
    • Hand Tools
    • Hydraulic & Pneumatic Tools
    • Use of Portable Electrical Equipment
    • Portable Woodworking Machines
  • Underground Services
    • Working Close To Underground Services
  • Underground Tanks
    • Underground Tanks Installation
  • Vehicles
    • Vehicles Movement On Site
  • Waste Disposal
    • Waste
    • Waste Disposal Reuse
  • Water
    • Work On Near Water
  • Weather
    • Weather
  • Welding & Burning
    • Use of Arc Welding Equipment
    • Welding
  • Work In & Around Occupied Premises
    • Work In & Around Occupied Premises
    • Office, Welfare & Storage
  • Work At Height
    • Work At Height
    • Scaffolding
    • Use of Ladders and Stepladders
    • Use of Trestles
    • Mobile Elevated Working Platforms
    • Use Of Mobile Scaffold Towers
  • Waste Disposal
    • Waste Materials
    • Use of Rubbish Skips
  • Unloading of Vehicles
    • Unloading of Vehicles
  • Installation of Air-Conditioners
    • Installation of Air-Conditioners

Note : If you require any additional documentation you can’t find here, let us know and we can compile it for you.

Email us: info@grisk.co.za

Documents are soft copy and in either Microsoft Word or Excel formats. Once payment is complete you will be redirected to instantly download the files you purchased.

1 review for Risk Assessments and Safe Working Procedures Combo

  1. Brent De Souse

    Here is so much risk assessments , i only needed a few of them but i am so happy I got all of them now i have them all for future use. I am so impressed.
    Great work Griffin team!!

Leave a customer review

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Your Cart

Your cart is empty.